What customers say
SunTech Solar SolutionsSolar design and installation · Kissimmee, FL
Serving Kissimmee and nearby towns
★★★★★4.8 from 9 Google reviews
SunTech Solar Solutions is a solar quote and installation service for Kissimmee, FL homes whose bill peaks with the air conditioner. It would size solar from that summer peak, not a yearly average, and hand you a monthly load chart, priced sizes and what your utility does with spring surplus.
Kissimmee, Florida
SunTech Solar Solutions installs around Kissimmee and the 192 corridor, where the air conditioner sets the bill and a yearly average hides it. We size from the summer peak and hand you the monthly load chart behind it.
What customers say
Serving Kissimmee and nearby towns
★★★★★4.8 from 9 Google reviews
What we do
Call or visit
| Phone | (321) 407-7647Call to book an assessment. |
|---|---|
| Office | 100-112 Buenaventura Blvd #443, Kissimmee, FL 34743Parking on site. |
| Estimates | Free, in writingDesign and price as separate documents. |
Why homeowners pick us
Our story
Installing across Kissimmee, St. Cloud, Davenport, Poinciana and Celebration.
Where we work
Proposed service. Six steps, each ending in something written you can check. Timelines depend on the permit office and the utility.
You bring 12 months of bills in kWh, interval data if your utility offers it, A/C age and label photo.
You get An intake checklist (the quote checklist on this site).
You bring Nothing new: the bills do the work.
You get A monthly load chart: base load, cooling load and your peak month named.
You bring About one visit: roof access, attic, main panel and meter.
You get Notes per roof plane, west-facing area marked, city or county and utility confirmed.
You bring Your questions on the load chart.
You get Size A, Size B and a middle size, solar-only, with $/W against the state benchmark.
You bring Your choice of size.
You get A 12-month bill table per size and one written recommendation with reasons.
You bring Signatures on the permit and utility pages.
You get The installer of record named with a DBPR licence number, then permission to operate.
Size one household's solar two ways. On its yearly average it needs about 8.5 kW of panels; to cover its August bill, about 12.4 kW (illustrative calculation, worked through below). A kilowatt (kW) measures system size; a kilowatt-hour (kWh) is the energy your bill counts.
That 3.9 kW gap is the decision. It pushes the system past the 10 kW line where both utilities serving Kissimmee homes start asking for liability insurance. And whether you need those extra panels at all depends on your meter: can spring surplus pay for August, or is it credited at a lower value?
A quote with one number hides this. The U.S. Department of Energy's step-by-step guide for consumers going solar tells buyers to review their bills for how much power they need "annually and seasonally". EcoGen, which publishes a state solar cost index, reports in its Cost Index methodology that an annual-average sizing formula came within 20% of real installed sizes in only 19 of 41 states, so it replaced the formula.
The season also sets the price of each kWh. Kissimmee Utility Authority (KUA), the city's utility, charges 12.310¢ per kWh of base energy for a home's first 1,000 kWh a month and 13.575¢ above that, before fuel, conservation charges and taxes (rate schedule effective January 1, 2026). In the example home, August's 1,550 kWh crosses that line by 550 kWh, so cooling kWh are the dearest ones solar can replace.
Sized to cooling does not mean always bigger. How we work. The quote would show the August gap and three ways to close it:
Then it would recommend one size, with reasons. Service for any address covers these towns.
We include the bill intake, the cooling-load read, the site read, the priced sizes, a month-by-month bill model for each size, and a written recommendation. Three pieces would be optional, each priced on its own line: the peak-reduction sheet, pricing for a west-facing layout, and monitoring that shows monthly output against use. Financing, battery design and backup power are not part of this proposal.
How we work. The assessment would settle the address first, because it decides who issues your permit and what your surplus earns:
"12 kW, here's the price" gives you nothing to check. How we work. The written quote would hold five documents:
| Deliverable | What it answers | Decision it settles |
|---|---|---|
| Monthly load chart | Base vs cooling kWh each month, peak month named | Whether your bill is really an August problem |
| Sizing sheet | Size A, Size B and a middle size at or under 10 kW: kW DC, panel count, solar-only price, $/W vs the state benchmark, tier flag | What the cooling peak costs in panels |
| 12-month bill table, per size | Production vs use by month, surplus and shortfall valued at your meter's actual rule, plus the minimum bill | Whether banked credit or more panels covers August |
| Peak-reduction sheet (optional) | What a KUA survey, A/C tune-up or replacement, attic insulation or pool-pump timer changes in Size B, each priced | Whether to cut the peak before buying panels for it |
| Recommendation | One size with reasons; installer of record, permit office, utility step | Who does the work, under which rules |
The recommendation would name the installer of record with a Florida license number you can check on DBPR's Verify a Licensee search: a solar contractor, or another certified or registered contractor working within its scope.
kW DC is the panels' combined direct-current rating. Panels make direct current (DC); the inverter turns it into the alternating current (AC) your house uses. Quoting in DC keeps every price comparable.
Illustrative calculation. Example inputs, not a real home or a quote. Yearly use: 13,248 kWh (12 × 1,104 kWh, EcoGen's Florida average month; state input). August 1,550 kWh, January 820 kWh (example inputs), so cooling adds about 730 kWh in August. Yearly output: 1,555 kWh per kW, EcoGen's Florida factor, referenced to Jacksonville (state input, not a Kissimmee measurement). August output: 125 kWh per kW (example input; a real quote uses an NREL PVWatts result for your roof). Prices: EcoGen's Florida State benchmark, $2.46 per watt.
| Illustrative calculation | Size A: yearly average | Middle: Tier 1 line | Size B: August peak |
|---|---|---|---|
| Method | 13,248 ÷ 1,555 | 10 kW cap | 1,550 ÷ 125 |
| Size | 8.52 kW DC | 10.0 kW DC | 12.4 kW DC |
| Price at $2.46/W (State benchmark) | about $20,958 | $24,600 | about $30,504 |
| August output (example factor) | about 1,065 kWh | 1,250 kWh | 1,550 kWh |
| August shortfall | about 485 kWh | about 300 kWh | none |
| Yearly output | about 13,248 kWh | about 15,550 kWh | about 19,282 kWh |
| Utility tier | Tier 1 | Tier 1, at the limit | Tier 2 |
Whether KUA measures the 10 kW line in AC or DC is not stated, so ask. EcoGen's Florida cost page describes the line as 10 kW AC, about 11,764 W DC; Size B crosses it either way.
Size B covers August outright. It also makes about 6,034 kWh a year more than the home uses, for about $9,546 more than Size A (illustrative calculation). What that surplus is worth depends on the meter:
Now the August bill itself. At 1,550 kWh, August base energy on KUA is about $197.76 (1,000 × 12.310¢ + 550 × 13.575¢), before the customer charge, fuel, conservation charges and taxes (illustrative calculation). Each kWh above 1,000 costs 1.265¢ more than the first 1,000.
Peak-first changes the arithmetic. If A/C or insulation work cut August by 300 kWh (example input, not a promised result), Size B drops to 1,250 ÷ 125 = 10.0 kW, on the Tier 1 line instead of past it.
The answer changes next door: in St. Cloud, OUC now credits exported power in dollars, not banked kWh.
A quote's total mostly follows from these lines:
To check the solar part, remove any battery or roof lines and divide the solar-only price by the DC watts. Compare with EcoGen's Florida solar cost benchmark of $2.46 per watt (State benchmark): a modeled installed cash price before incentives, solar only, EcoGen Solar Cost Index September 2026 Edition, prices as of September 25, 2026. EcoGen says most Florida quotes fall between $2.10 and $2.70 per watt (February 2026 data) and calls the index a benchmark, not a quote for your home.
Illustrative calculation. $26,000 solar-only for 10,400 W DC = $2.50 per watt: 4¢ above the $2.46 State benchmark, inside the $2.10 to $2.70 range. It is a reason to ask what the extra 4¢ covers, nothing more.
Two tax rules and one expired credit:
The city-limits check decides the office.
| City of Kissimmee | Unincorporated Osceola County | |
|---|---|---|
| Office | Permitting Division | Community Development Department |
| Where you apply or track | EnerGov Citizen Self-Service portal | Online Permit Center; search permits at permits.osceola.org |
| What applies to solar | "Solar Panel" is its own permit type; Electrical and Re-Roof are separate types | Solar panel installation is on the county's residential permit list |
| Ask your installer | Which permits they will pull | The permit number, to track it |
See the city's types of permits and the county's permit information page, where fees are due when the permit is pulled.
Florida's HB 803 permitting changes have applied in Kissimmee since July 1, 2026. The city says electrical work, roofing, projects of $7,500 or more and flood-zone work always need a permit. Rooftop solar involves electrical work and has its own permit type, so a contractor's "no permit needed" is not enough.
Davenport splits between the city, Polk County and Osceola County, so the same check comes first there.
The permit lets you build. The utility lets you switch on, and its rule values the spring surplus in your bill table.
| KUA | Duke Energy Florida | |
|---|---|---|
| Who it serves here | City of Kissimmee and some unincorporated addresses | Some unincorporated addresses (check your bill) |
| Surplus credit | Bill credit set under a three-way agreement of the Florida Municipal Power Agency (FMPA), KUA and you; rate not stated in the tariff | kWh credited to next month's use |
| Carryover | Credits carry forward | Up to 12 months |
| Leftover credit | Paid when you close the account | Paid at year end at a rate based on the COG-1 as-available tariff |
| Tier 2 (above 10 kW, up to 100 kW) | $320 non-refundable fee plus $1,000,000 liability insurance | Insurance of up to $1 million; ask the fee |
| Ask in writing | ¢ per exported kWh; AC or DC tier line | Current tariff sheet and Tier 2 fee |
KUA. KUA's net metering page sets the order: the permit or a Notice of Commencement comes first, then the interconnection application. A Notice of Commencement (NOC) is the recorded notice that construction is starting. KUA allows up to 5 business days to confirm receipt, up to 30 days to approve, and up to 10 business days to set a bidirectional meter and grant permission to operate (PTO). You still pay at least KUA's minimum charge. Do not let anyone call KUA's export credit "full retail".
Duke Energy Florida. As an investor-owned utility, Duke is bound by Florida PSC Rule 25-6.065. Surplus becomes a kWh credit on next month's bill, rolls for up to 12 months, and the leftover is paid out. So banked spring credit can cover August on Duke, and Size A can be enough. Most of Belle Isle is on Duke, where spring kWh bank into summer; in Orlando, OUC or Duke serves a home depending on its address.
Ask your installer to name the owner of each step.
KUA's limits are maximums, not a promised timeline; the Department of Energy notes permits and inspections can take weeks to months.
A monitoring app shows production. It cannot tell you whether the system does what the quote said, so keep the sizing sheet and bill table, and compare each month's output against the prediction.
Use these with any Kissimmee quote, including one from the service, alongside the quote checklist on this site.
Not for a home system installed now; it ended for property placed in service after December 31, 2025. Some Kissimmee solar pages we read still promise it until 2032.
KUA's tariff credits surplus under its FMPA agreement without stating a rate. Ask KUA for the value per exported kWh in writing before sizing for surplus.
On Duke Energy Florida, leftover credit is paid after the 12-month carryover at a COG-1-based rate. On KUA, unused credit is paid when you close the account. Either way, a large leftover means panels whose output earns a lower or unknown value, which is why the August numbers come first.
Type the kWh from each month of your last twelve bills. The sizer draws your year, finds the peak month and compares two sizes: one built from the yearly average (Size A) and one built from the peak month (Size B). It runs on this device; nothing is sent or stored.
It starts with an illustrative household (13,248 kWh a year), not a real home. Sizes are rough first estimates for comparing quotes, not a design.
State benchmark: EcoGen Solar Cost Index, Florida, September 2026 Edition, a modeled solar-only cash price before incentives. Size B covers the peak month outright; whether you need it depends on what your utility pays for spring surplus.
Each guide covers what changes the size of a quote in that town: the permit office, the utility at the address and how it credits spring surplus. Coverage is proposed and not confirmed.
Pick your town and what you want priced. The site builds a checklist to take to any installer's quote visit, with your peak sizer numbers if you charted them. It runs on this device: nothing is sent or stored.